SEH TPG-65 Uživatelský manuál Strana 12

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 107
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 11
General Information
TPG User Manual 12
1.5 First Steps
This section provides all the information that you need for a fast
operational readiness.
Proceed as follows:
1. Read and observe the security regulations in order to avoid
damages to people and devices, see:
Ö11 .
2. Carry out the hardware installation. The hardware installation
comprises the connection of the ISD to the network and the
mains supply; see: 'Quick Installation Guide'.
3. Make sure that an IP address is stored in the TPG; see: ’Saving
the IP Address in the TPG’ Ö13.
4. Specify the ThinPrint port and other ThinPrint settings; see:
Ö40.
5. Specify the printers to which the TPG6 will send the print jobs;
see: ’How to Embed Printers’ Ö42.
ª The TPG is operational.
Zobrazit stránku 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 106 107

Komentáře k této Příručce

Žádné komentáře